Go from a country map to a screened plot in minutes: ranked connection points for your technology, land that fits your project and a first feasibility check you can share.
In the map: open the Site finder tab at the top of the side menu.
Gridscouter map with the ranked BESS site list and the score pop-up of the top Dutch 380 kV substation
Premium · 14 days free
Ranked sites for BESS, solar, wind and data centers
Every 110 kV+ substation gets a score and a suggested project size for your technology, so you start with the most promising connection points instead of a blank map.
1Open the map and pick your country.
2Go to Site finder and choose BESS, PV, Wind or DC.
3Tap a site in the ranking to zoom in and see its score, suggested MW/MWh and why it scores that way.
Screen recording · Land position finder around 380 kV Dodewaard showing 18,825 scanned parcels, 1,684 valid plots and 103 combined plots
Premium · 14 days free
Land position finder
Click a substation and Gridscouter scans up to 5 km around it, lighting up plots that are big enough for your project, including neighbouring plots that together fit. In the Netherlands it uses official Kadaster parcels.
1In Site finder, press Find land position.
2Click near any substation on the map.
3Set your minimum plot size, accepted land use and distance, then run due diligence on the nearest plots.
Land feasibility panel with a 'Feasible with work' verdict, flood, Natura 2000 and heritage checks and a PDF report button
Premium · 14 days free
Land feasibility check and PDF report
Click any plot for a first screening: grid distance, terrain, noise zone, flood risk, Natura 2000, nature, heritage, archaeology, soil and Seveso sites, with a clear verdict and a downloadable PDF.
1Press Check land feasibility, or Check next to a land result.
2Click the plot you want to screen.
3Read the verdict, show the findings on the map and download the PDF report.
See the companies behind every project, follow the pipeline to 2031 and find out which lenders, law firms, suppliers and contractors are active in your market.
In the map: open the Market intelligence tab at the top of the side menu.
Screen recording · Rabobank selected as lender: nine Dutch projects ringed on the map with a pop-up for Windpark Noordoostpolder
Premium · 14 days free
Filter the map on a lender, law firm or supplier
Open a category such as banks and lenders, law firms, equipment suppliers or EPC contractors, pick a company and every project it worked on lights up on the map, with its role and the source.
1Open the Market intelligence tab and go to Who's involved.
2Open a category, for example Banks & lenders.
3Pick a company: its projects get a ring on the map. Click one for the details.
Project pop-up for GIGA Leopard listing 18 companies: owner, Tesla as battery supplier, EPC contractor, lenders and legal advisors
Premium · 14 days free
Who's involved in every project
Click a project to see its owner, battery or turbine supplier, EPC contractor, grid operator, offtaker, investors, lenders and legal and financial advisors, each with a public source.
1Click any battery, solar or wind project on the map.
Project search for Eneco showing 30 matching projects in a list and on the Dutch map
Premium · 14 days free
Find projects by owner, stage or known partners
Search any developer or owner, filter on built, under construction or pipeline, or show only projects where the partners are known, and get a clickable list of matches.
1In Market intelligence, type a name or owner, for example Eneco.
2Pick the stages you want to see.
3Click a project in the result list to zoom to it.
Screen recording · Forecast playback reaching 2030 with new offshore wind and grid projects appearing on the Dutch map
Premium · 14 days free
Pipeline and grid forecast to 2031
Play the market forward year by year: planned grid lines and substations, announced battery, solar, wind and data center projects, and how they change the best sites.
1Switch on Predicted infrastructure in Market intelligence.
2Press Visualize 2026–2031, or pick a single year.
3Click a project to see its status, target year and source.
Market players page for Germany with mapped capacity, owner concentration and a market share chart
Free preview · full list in Premium
Market players: who owns the assets
League tables of battery, solar, wind and hydro owners per country, with market share, mapped capacity and a projection of how the ranking changes with the pipeline.
The free map shows high-voltage lines, substations and energy projects across Europe. Switch layers on and off, filter substations by voltage and add official grid capacity where it is published.
In the map: open the Map layers tab at the top of the side menu.
Germany map with transmission lines, substations and energy projects and the Map layers tab open
Free map
High-voltage grid and substations by voltage
380/400 kV, 220 kV and 110/150 kV lines and substations for 17 countries, with names and voltage levels, so you can read any market's grid in seconds.
1Open the Map layers tab.
2Switch line voltages on or off.
3Tap a substation voltage to hide or show those substations.
Belgium map with Elia grid capacity per substation coloured by available MW
Free map
Official grid capacity
Where grid operators publish it, see the capacity left per substation: Elia hosting capacity in Belgium and Caparéseau (RTE and distribution operators) in France.
1Open Belgium or France.
2In Map layers, switch on the grid capacity layer.
3Red, yellow and pink dots show less than 5 MW, 5–20 MW and 20+ MW left.
Ranked sites, land finder, feasibility reports, project partners and the 2031 forecast in 17 countries. Developer plans from €49/month billed yearly, or €79 monthly.