Bosnia & Herzegovina power grid and renewable energy map
Recommended BESS sitesPreview Estimated score and suggested size per 110 kV+ substation. Tap to zoom in.
How is this calculated? Score: voltage level 35%, nearby solar + wind (30 km) 35%, number of connected lines 20%, little nearby hydro 10%. Size: 10–50 MW at 110 kV, 40–150 MW at 220 kV, 100–300 MW at 400 kV, scaled up by nearby solar/wind and line count. 2-hour duration. Real free grid capacity is not public, so this is an estimate. Confirm with NOS BiH / Elektroprijenos BiH. Unlock every ranked site
Compare all substations, scores and suggested BESS sizes.
Unlock BESS Developer BESS land scouting Land feasibility checkLand position finder
Click any substation, then “Find land position” to scan up to 5 km and light up plots big enough for your project, including adjoining plots that together fit.
Find land positionNoise zone, flood risk, Natura 2000, nature, heritage, archaeology, soil and Seveso for any plot.
Screen nearby land, terrain, road access and available zoning or registry sources.
View land opportunities Transmission
400 kV lines 220 kV lines 110 kV lines Other / unknown
Substations
SubstationsEnergy projects
BESS Solar PV Wind Hydro Data centers
Coverage follows OpenStreetMap records; Bosnia and Montenegro have no data centers recorded there yet.
Data © OpenStreetMap contributors