Montenegro · Forecast to 2031 · English

Montenegro's energy outlook to 2031

Trends shaping solar, wind, storage and the grid in Montenegro toward 2031, including the subsea link to Italy and the Pljevlja coal plant transition.

See Montenegro on the live grid map

Every substation, grid line and energy project. Free, no sign-up.

Open the Montenegro map →

A small grid with a big cable

The 500 kV HVDC cable between Lastva and Pescara links Montenegro to Italy. It turns the country into a potential exporter of renewable power and makes coastal 400 kV nodes valuable.

Coal transition

The Pljevlja coal plant in the north is the largest single source. Its future shapes how much room opens for new solar, wind and storage.

Check this on the Montenegro map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Renewables

Krnovo and Možura wind farms already operate. Large solar projects have been proposed around Briska Gora near Ulcinj and in the Nikšić area. Gridscouter scores are estimates from open map data, not grid operator capacity figures. Confirm connection capacity with the grid operator.

Open the Montenegro map →

Official grid capacity sources for Montenegro

No public capacity map; capacity is confirmed per request.

Free report

Top 10 BESS grid positions in Montenegro

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.