Hybridisation Defined

In Portugal, hybridisation involves adding a new generation technology (e.g., solar to a wind farm) at the same connection point.

Regulatory Benefits

New rules allow developers to use existing grid capacity for additional generation or storage, often with a simplified permitting path.

Grid Capacity Limits

The total injected power must not exceed the existing contracted capacity (potência de ligação) unless a new request is approved.

Maximizing Assets

Co-locating batteries with solar or wind helps reduce curtailment and increases the overall efficiency of the grid connection.

Note

This is a general overview, not legal advice. Rules change; check with the local authority and a local adviser before committing.