Where to build a data center in the US in 2026: power markets compared
Texas, Virginia, Ohio, Georgia, Arizona, Oregon, Wisconsin and Louisiana compared on what matters most for data centers: large-load queues, tariffs and power supply.
The short version
There is no single best state. Each market trades off speed, cost and contract risk differently. Here is how the main markets compare on power, the factor that decides most data center timelines.
Texas (ERCOT)
The largest pipeline: 245 large loads requesting about 166 GW in ERCOT's November 2026 survey. SB 6 adds screening fees, site-control requirements and curtailment rules for loads of 75 MW and up. Fast-moving, but competitive — strong substations go first.
Early access
Want a US site finder? Join the waitlist
We're deciding which US markets to map first. Waitlist members get early access and a free substation shortlist for their target state.
No spam. One email when early access opens.
Virginia and the PJM region
The biggest existing cluster, but the tightest supply: PJM's last two capacity auctions cleared at the price cap, and the 2027/28 auction came up 6,623 MW short. Expect long connection timelines in the busiest zones.
Ohio
AEP Ohio's data center tariff sets an 85% minimum on subscribed demand over 12 years, with financial guarantees and exit fees. Clear rules, but a firm commitment is needed.
Georgia
Georgia Power reported a 50.9 GW large-load pipeline in Q3 2025, with 11 GW committed across 28 projects. A large, active market where commitments matter more than headline pipeline numbers.
Arizona
At SRP, 24 applicants sought 7.2 GW; after initial deposits were required, that fell to three applicants seeking about 1 GW. A clear sign that deposits filter out speculative requests. Those are SRP figures; APS runs a separate process.
Oregon
Oregon's POWER Act led to PGE's Schedule 96, with cost-reflective data center rates, contract protections and responsibility for the required emissions-free supply. This applies to PGE, not every utility in the Pacific Northwest.
Wisconsin
The state regulator lowered We Energies' very-large-customer threshold to 100 MW and set 15-year minimum initial contracts in April 2026.
Louisiana
Entergy Louisiana received approval for three combined-cycle gas plants to support Meta's Hyperion data center: two in Richland Parish expected in late 2028 and one at Waterford by the end of 2029. This shows the build-your-own-supply model at scale.
How to choose
Start from where your tenant needs to be, then compare substations in two or three markets. A substation on a map tells you where the grid is, not whether it has room. Only the utility or grid operator can confirm available capacity and a service date.
Sources
- ERCOT — Large load community impact RFI, PUC update (5 Nov 2026)
- Texas Legislature — SB 6 enrolled text (89th Legislature)
- PJM — 2027/2028 auction results (17 Dec 2025)
- AEP Ohio — Data center tariff approved (9 Jul 2025)
- Utility Dive — Georgia Power large-load pipeline (Nov 2025)
- Pinal Post — SRP data center power costs (Aug 2026)
- Oregon PUC — POWER Act implementation (2026)
- Wisconsin PSC — Very large customer decision (24 Apr 2026)
- Entergy Louisiana — LPSC approval for Meta data center supply (20 Aug 2025)