Find US data center sites next to strong substations
Utilities have more large-load requests than they can serve. The best data center sites are next to a strong substation, not just on cheap land. Gridscouter already does this across 17 European countries — and we're testing a US version.
- Substations ranked for data centers by voltage, connected lines and nearby generation
- Large-load rules per utility and market, side by side
- Land near each substation, with distance to the grid
Early access
Want a US site finder? Join the waitlist
We're deciding which US markets to map first. Waitlist members get early access and a free substation shortlist for their target state.
No spam. One email when early access opens.
US data center power guides
A five-step, power-first approach to picking US data center sites: power market, substations, utility large-load rules, land and fiber, and what to confirm before you sign.
Texas SB 6 sets new rules for loads of 75 MW and up: screening fees, site control, backup-generation disclosure and curtailment. Here's what it means for data center sites in ERCOT.
PJM capacity prices jumped from $28.92 to $269.92/MW-day and then hit the cap twice. How data center load drives PJM's forecasts, and what it means for Virginia and Ohio sites.
Texas, Virginia, Ohio, Georgia, Arizona, Oregon, Wisconsin and Louisiana compared on what matters most for data centers: large-load queues, tariffs and power supply.
Where to find US substations, transmission lines, generators and queue data after HIFLD Open shut down: EIA-860, EIA-861, ISO queues, Queued Up and county parcel records.
Data center land needs range from a few acres to 800 acres. How to size a site by MW, what large AI campuses use, and why distance to a substation matters more than acreage.
Building in Europe too?
Our European maps are live today: substations ranked for data centers, land near each one and instant site checks, with a 14-day free trial.
European data center site finder