Alberta data centre site finder
Alberta received over 20 GW of data centre requests against a 1,200 MW interim limit. The sites that move first combine transmission, gas and a supportive municipality. Gridscouter already maps this across 17 European countries — Alberta could be next.
- 240 and 500 kV substations ranked for data centres
- AESO connection projects and who else wants the same node
- Land near each substation, with gas and Crown-land checks
Early access
Want an Alberta map? Join the waitlist
We're deciding whether to map Alberta next. Waitlist members get early access and a free substation shortlist.
No spam. One email when early access opens.
Alberta data centre guides
Alberta received over 20 GW of data centre requests. How AESO's interim 1,200 MW limit was allocated, what Phase 2 and bring-your-own-generation mean, and what to check next.
Alberta's AI data centre strategy, the levy on data centres of 75 MW and up, and the rules that favour projects bringing their own generation — plus the major projects so far.
A practical guide to Alberta data centre sites: AESO and the transmission owners, 138/240/500 kV infrastructure, AltaLIS parcels, Crown land checks and AUC approvals.