Data Center Developer plan

FLAP-D is full. Find data center sites in Europe next to strong grid connections.

Frankfurt, Amsterdam and Dublin are booked into the 2030s. Gridscouter ranks every substation in 17 countries for data centers, finds flat, road-connected land next to it and checks the site — so you start with power, not with land.

14 days free · €0 today

€49/month

billed yearly, per country — or €79/month, cancel any time

Start 14-day free trialor open the free map first

Why the usual hubs are closing

Amsterdam

No new large data centers admitted since June 2025; major grid relief expected around 2035 (Liander).

Frankfurt

Syna tells new applicants to plan for connections in the early-to-mid 2030s; ~800 MW of extra enquiries in H1 2026.

Dublin

New data centers must bring their own generation, with at least 80% of demand matched by new Irish renewables (CRU, Dec 2025).

London

West London grid limits have delayed housing connections; data center demand is one of the causes (London Assembly).

Paris

Nearly 18 GW reserved with RTE, 7 GW in Île-de-France alone — the queue is long.

Where data center development is going

Announcements are investment plans, not capacity in operation. Open each map on the Data center tab to see which substations score best.

Spain

AWS has announced €33.7 billion for Spain. Red Eléctrica lists Madrid and Zaragoza nodes for demand-access tenders.

Portugal

Start Campus opened 26 MW at Sines in 2025, with a 1.2 GW campus planned.

France

RTE fast-track sites pair large industrial plots with nearby 400 kV substations.

Sweden

Microsoft is expanding at Gävle, Sandviken and Staffanstorp (SEK 33.7 billion).

Finland

Google announced €13 billion for Finnish digital infrastructure and clean energy in 2026.

Denmark

Microsoft opened its Denmark East region in 2026; Meta's Odense site reuses its heat.

Belgium

Google is investing €5 billion in 2026–2027, expanding Saint-Ghislain in Wallonia.

Italy

Microsoft announced €4.3 billion to expand its Italy North region around Milan.

Poland

Microsoft is investing PLN 2.8 billion in its Polish cloud campuses.

Austria

Microsoft opened an Austrian region with three data centers around Vienna in 2025.

Switzerland

Zurich's EKZ received over 100 data center connection enquiries in five years.

Romania

An announced pipeline of over 1.8 GW — much of it not yet built.

Germany

Frankfurt is booked; look at other 380 kV nodes. New sites must reach PUE 1.2.

Netherlands

Large sites only in Eemshaven or Hollands Kroon; smaller ones on existing industrial connections.

What the Data Center plan shows you

  • Ranked data center sites with suggested MW
  • Flat, road-connected land with industrial land preferred
  • Instant site checks: Natura 2000, flood, heritage, noise and distance to the grid
  • Forecast of planned grid upgrades and projects to 2031

How sites are scored

Score: voltage level 30%, connected lines (backup supply) 25%, nearness to large cities 20%, existing data centers within 20 km (fiber) 10%, renewable supply within 15–20 km 15%.

Size: 10–30 MW at 110 kV up to 100–300 MW at 400 kV.

Excludes towns, buildings (60 m buffer), forests, water, protected areas and slopes over 5%.

Industrial land and road access weigh extra.

Land need: 5–20 ha, about 1 ha per 10 MW.

Scores are screening estimates. Always confirm capacity and a connection date with the grid operator. Methodology