Croatia's energy transition to 2031: what developers should watch
Key trends for solar, wind, storage and grid in Croatia toward 2031: HOPS grid plans, Dalmatian wind and solar, and growing battery demand.
See Croatia on the live grid map
Every substation, grid line and energy project. Free, no sign-up.
Open the Croatia map →Solar is accelerating
Croatia's solar capacity has grown fast since 2022, led by Dalmatia and Slavonia. Large parks are planned around Šibenik, Zadar, Obrovac and in eastern Croatia.
Wind in Dalmatia
Most wind farms sit in the Dalmatian hinterland between Zadar and Split. New projects increasingly include repowering of older turbines.
Check this on the Croatia map
Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.
Grid
HOPS, the transmission operator, publishes a ten-year development plan with new 400 kV and 220 kV reinforcements, especially to move southern renewable power north. Gridscouter scores are estimates from open map data, not grid operator capacity figures. Confirm connection capacity with the grid operator.