France has 18 GW of data center grid reservations. How RTE's fast-track works

RTE reports about 80 data center projects with nearly 18 GW reserved, 7 GW in Île-de-France. How the fast-track sites work, why 400 kV matters and how to screen French sites.

See France on the live grid map

Every substation, grid line and energy project. Free, no sign-up.

Open the France map →

The short version

France has become Europe's most active data center grid market by reservations. By May 2026, RTE reported about 80 projects with nearly 18 GW reserved, including around 7 GW in Île-de-France and 6 GW in Hauts-de-France. These are reservations, not data centers in operation.

The fast-track sites

To speed up large projects, France offered five 'fast-track' sites with large industrial plots and strong electrical infrastructure; four were allocated at Choose France 2026. RTE's eligibility criteria look at nearness to 400 kV infrastructure and whether congestion is manageable — not just nearness to Paris.

Check this on the France map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

What developers can learn from it

RTE notes that new transmission-connected data centers commonly request 100–200 MW, while existing smaller facilities sit on distribution networks. The fast-track criteria are a good checklist for any French site: large flat industrial land, a nearby 400 kV substation, and a part of the network that can take the load.

On the Gridscouter France map, the Data center tab ranks substations by voltage, number of connected lines, nearness to large cities, existing data centers nearby and renewable supply. Combine that with the land finder to see which plots near a 400 kV node are flat and road-connected.

Gridscouter scores are screening estimates from open map data, not grid operator capacity figures. A nearby substation is not proof of available power: always get capacity, reinforcement scope and a connection date confirmed by the grid operator.

Next step

Try the Data Center Developer plan free for 14 days — €0 today. Cancel any time before the trial ends and you pay nothing.

See ranked data center sites in France →

Official grid capacity sources for France

S3REnR capacity applies to renewables; storage and large loads follow other connection rules.