Why two weeks is enough for a first shortlist

Most early-stage BESS scouting comes down to three questions: which substations are close enough, is there usable land nearby, and are there obvious showstoppers. With the right data in one place, a developer can answer these for a whole region in two weeks.

Every Gridscouter plan starts with 14 days of full access for €0 today. Cancel any time before the trial ends and you pay nothing.

Days 1–3: rank the substations

Open the map for your country and switch to the BESS ranking. Look at voltage level, nearby existing batteries and the suggested size. Pick 10–15 substations worth a closer look.

Check this on the Netherlands map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Days 4–8: find land positions

Use the land finder on each shortlisted substation. It searches the area around the substation for plots of the right size and zoning, and combines adjacent plots. Note the best two or three per substation.

Days 9–12: screen the risks

Run the feasibility check on each plot: distance to houses, nature protection, heritage, flood risk, grid distance and terrain. Drop anything with a red flag.

Days 13–14: decide what to pursue

You should now have a short list of sites with land, a rough size and known risks. That is the moment to contact landowners and the grid operator.

Gridscouter scores are estimates from open map data, not grid operator capacity figures. Always confirm connection capacity with the grid operator.

Start your 14-day free trial →

Official grid capacity sources for Netherlands

Status is per area, not per plot, and says nothing about land, zoning, noise or flood risk. A 'waiting list' area can still suit a battery on a flexible or non-firm contract.

Netcongestie per provincie →

Free report

Top 10 BESS grid positions in Netherlands

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.