Romania's high-voltage grid: a developer's guide
Transelectrica's 400, 220 and 110 kV network explained for battery, solar and wind developers.
See Romania on the live grid map
Every substation, grid line and energy project. Free, no sign-up.
Open the Romania map →Who runs the grid
Transelectrica runs the transmission grid at 400 and 220 kV. Regional distributors run the 110 kV network and below.
Connections
Developers request a technical connection permit (ATR). Many nodes in Dobrogea are already heavily booked, so planned upgrades matter.
Check this on the Romania map
Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.
Note
Gridscouter scores are estimates from open map data, not grid operator capacity figures. Confirm connection capacity with the grid operator.