Romania · Grid guide · English

Romania's high-voltage grid: a developer's guide

Transelectrica's 400, 220 and 110 kV network explained for battery, solar and wind developers.

See Romania on the live grid map

Every substation, grid line and energy project. Free, no sign-up.

Open the Romania map →

Who runs the grid

Transelectrica runs the transmission grid at 400 and 220 kV. Regional distributors run the 110 kV network and below.

Connections

Developers request a technical connection permit (ATR). Many nodes in Dobrogea are already heavily booked, so planned upgrades matter.

Check this on the Romania map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Note

Gridscouter scores are estimates from open map data, not grid operator capacity figures. Confirm connection capacity with the grid operator.

Open the Romania grid map →

Official grid capacity sources for Romania

Issued ATRs exceed what the grid can host in Dobrogea and Banat, so lists overstate competition and understate headroom elsewhere.

Free report

Top 10 BESS grid positions in Romania

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.