Romania · Permitting · English
Solar PV permitting steps in Romania
The essential regulatory steps to permit a utility-scale solar project in Romania.
Land classification
Ensuring land is correctly classified for industrial or energy use is the first step. Farmland may require a specific procedure to be removed from the agricultural circuit.
Urbanism certificate
This document from the local authorities outlines the legal, technical, and economic requirements for the project site.
Environmental permits
An environmental impact assessment is usually required, focusing on biodiversity and land use changes.
Final authorization
The final construction permit and the ANRE establishment license are needed before work can begin on site.
Note
This is a general overview, not legal advice. Rules change; check with the local authority and a local adviser before committing.