Romania · Permitting · English

Solar PV permitting steps in Romania

The essential regulatory steps to permit a utility-scale solar project in Romania.

Land classification

Ensuring land is correctly classified for industrial or energy use is the first step. Farmland may require a specific procedure to be removed from the agricultural circuit.

Urbanism certificate

This document from the local authorities outlines the legal, technical, and economic requirements for the project site.

Environmental permits

An environmental impact assessment is usually required, focusing on biodiversity and land use changes.

Final authorization

The final construction permit and the ANRE establishment license are needed before work can begin on site.

Note

This is a general overview, not legal advice. Rules change; check with the local authority and a local adviser before committing.