Finding land for a solar park: a step-by-step guide

From substation to plot: how to find flat, well-connected land for utility-scale solar.

Step 1: sunshine and grid

Use the PV ranking to find substations with good sunshine, suitable voltage and room for new solar.

Step 2: land

The land finder looks for large, flat plots near the substation and combines neighbouring plots into one position.

Check this on the Germany map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Step 3: constraints

Check nature protection, heritage, flood risk and terrain with the feasibility check before contacting landowners.

Try it

Every Gridscouter plan starts with 14 days of full access for €0 today. Cancel any time before the trial ends and you pay nothing.

Gridscouter scores are estimates from open map data, not grid operator capacity figures. Always confirm connection capacity with the grid operator.

Find solar land free for 14 days →

Official grid capacity sources for Germany

Formats differ per operator, and large battery queues mean published headroom is often already reserved.

Free report

Top 10 BESS grid positions in Germany

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.