Substation scouting checklist for solar, wind and battery projects

The checks developers run before picking a substation: voltage, distance, competition, land and constraints.

Start at the substation

Land without a realistic grid connection is worthless for energy projects. That is why experienced developers start at the substation and work outwards.

The checklist

Voltage level that matches your project size. Distance to suitable land, ideally within 1–2 km. Existing or planned projects competing for the same capacity. Overhead lines and access roads. Nature, heritage and flood constraints near the site.

Check this on the Germany map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Doing it faster

Gridscouter puts substations, existing plants, planned projects and land search on one map, so each item on the checklist takes minutes instead of days. Every Gridscouter plan starts with 14 days of full access for €0 today. Cancel any time before the trial ends and you pay nothing.

Note

Gridscouter scores are estimates from open map data, not grid operator capacity figures. Always confirm connection capacity with the grid operator.

Try the scouting map free for 14 days →

Official grid capacity sources for Germany

Formats differ per operator, and large battery queues mean published headroom is often already reserved.

Free report

Top 10 BESS grid positions in Germany

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.