Germany · Best sites · English

Onshore wind in Germany: the 2% target and where to build

How Germany's 2% land target for wind works, which regions are opening new areas, and how grid access shapes site choice.

See Germany on the live grid map

Every substation, grid line and energy project. Free, no sign-up.

Open the Germany map →

The 2% target

Under the Wind-an-Land law, each federal state must designate a share of its land for wind, adding up to 2% nationally by 2032.

Regions

The north remains strong, but Bavaria and Baden-Württemberg are designating more areas, which can mean less competition for grid capacity.

Check this on the Germany map

Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.

Note

Gridscouter scores are estimates from open map data, not grid operator capacity figures. Confirm connection capacity with the grid operator.

See wind turbines on the Germany map →

Official grid capacity sources for Germany

Formats differ per operator, and large battery queues mean published headroom is often already reserved.

Free report

Top 10 BESS grid positions in Germany

The ten best-scoring substations for battery storage, with voltage and suggested size. One-page PDF, free.