Grid capacity map Bosnia and Herzegovina: official sources explained
Which official grid capacity maps exist for Bosnia and Herzegovina, how to read them, what they don't tell you, and a five-step workflow to screen a site before you talk to the grid operator.
Official sources
For Bosnia and Herzegovina: NOS BiH (NOS BiH); Elektroprenos BiH (Elektroprenos BiH).
How to read them
NOS BiH publishes the indicative development plan; Elektroprenos BiH runs the transmission assets.
What they don't tell you
No public capacity map exists, so voltage and distance are the main public screen.
None of the official maps tell you whether there is usable land nearby, what the zoning is, or whether noise, flood or nature rules will block a project.
A five-step screen
1. Check the official source for the area's status. 2. On Gridscouter, find the nearest substations at the right voltage and their BESS, solar, wind or data-center score. 3. Run the land finder for plots within a set radius, filtered by size and land use. 4. Run quick due diligence on the best plots: noise, flood, nature, heritage and industrial-safety buffers. 5. Request connection conditions from Elektroprenos BiH or the entity utility.
Caveat
Gridscouter scores are estimates from open data, not grid operator capacity figures. Always confirm capacity with the operator.