How to permit a solar, wind or battery project in Bosnia and Herzegovina
Overview of who issues permits for renewable energy and battery projects in Bosnia and Herzegovina, the main steps, and how to choose land early.
See Bosnia & Herzegovina on the live grid map
Every substation, grid line and energy project. Free, no sign-up.
Open the Bosnia & Herzegovina map →Two entities, two systems
Energy permitting in Bosnia and Herzegovina is handled mostly by the two entities, the Federation of BiH and Republika Srpska, plus Brčko District. Rules, authorities and timelines differ, so first check which entity your land is in.
The main steps
Most projects go through land and spatial checks (an urban planning consent or location information from the municipality or canton), environmental review, an energy permit or concession, a building permit, and a grid connection agreement. In Republika Srpska, larger generation projects typically need a concession.
Regulators: FERK in the Federation and RERS in Republika Srpska issue licences. The state regulator DERK covers transmission. Grid connection runs through Elektroprenos BiH and NOS BiH for high voltage.
Check this on the Bosnia & Herzegovina map
Substations scored for BESS, solar, wind and data centers, plus land positions and instant site checks.
Where projects get stuck
Grid capacity and land ownership are the usual bottlenecks. Cadastre and land registry data are split between entities, and both registries need a login. Choose land close to a strong substation and check ownership early.
Use the map to shortlist
Gridscouter shows substations, a connection radius and suitable land patches with links to the cadastre. This is a general overview, not legal advice: confirm each step with the competent ministry, municipality and a local lawyer.